| Engineering Challenge: Wind Conversion Warrior | |
|
Industrial Technology LONG -TERM PROBLEM: WIND CONVERSION WARRIOR THE PROBLEM Your team’s problem is to design a machine that will travel using wind power. The wind will be produced by a 20” cooling fan mounted to a table that will be the “playing field” for the competition. Your vehicle will be designed so that when it reaches the end of the playing field it will fire/kick a plastic golf ball over the goal post positioned at the far end of the field for a conversion. “LET THE GAMES BEGIN” Thus there are two parts to the problem: 1. To design and build a machine that will travel the length of the
playing field under wind power. MATERIALS Chassis stock ( 3/8” x 3/4”) String LIMITATIONS 1. The maximum time for set-up and competition is 5 minutes.
See the “Playing Field” SCORING And Grading Points will be awarded for: PENALTIES 1. Dangerous horse play with the mouse trap will result in severe grade
reduction and could be grounds for suspension from the program. IT SHOULD BE NOTED THAT THIS ASSIGNMENT IS NOT COMPLETE AND THAT MR.
B WILL MAKE SOME CHANGES AS WE GO ALONG. |
|
| Home | Industrial Technology 1A |